03 January 2019

A lovely surprise....

by: Leonie A.

A grey day at Ebley Wharf and your Fundraising Team were on a photo shoot for our Celebratory Bollards and the next Trow edition.  Several photos later, we were packing up when the our day was brightened by a lovely lady from one of the wharf houses, who came out to thank all the volunteers involved with the canal restoration for all their hard work and for making Ebley such a wonderful place to live.  

Her thanks came with a yellow bag containing two good bottles of wine, to be shared between volunteers via Western Depot.  What a wonderful moment you all prompted and such unexpected kindness to share with you all.

02 January 2019

Project 'DNF' - No.5 Refit

Firstly, happy new year to you all.  At least the sun shone on our first day back, although No.5 was well coated in sparkling frost when we arrived.

Today's efforts targeted two areas.  The bilges were still deep in a mixture of oil, water and crud, so that was the primary job.  Secondly, the two fuel tanks were inspected internally.
The grunge in the bilges was attended to using a selection of methods.  The previous process of pumping the fluids into a large tank and letting the oil/water separate had worked well, so we did a bit more of that.  This method only worked to the point at which the bilge pump gave up due to low fluid level.

So, we concocted a system which could suck the grunge up using a vacuum cleaner, a large plastic bottle as a separator and a small hose at the sharp end.  This worked quite well for the water and light oil, however, when the brew approached that of heavy crude, it too gave up.

This then called for another attack using the copious supplies of wood shavings from the chippies.  Sprinkling the remaining areas worked really well and a sludge could be created that not only stayed on the shovel, but also left the treated area clean and dry.  The waste was then suitable to put in a bag.
Grade 'A' sludge

Most of the bilge was cleaned, there is a bit more to do under the cab area.

In the yard, where the two diesel tanks had bee taken for safe keeping, the task of undoing the numerous screws that secured the flat plate lids on began.  Eventually, we were able to see clearly into both tanks.  The Port side one still had a small amount of diesel in it and was generally quite clean.  The starboard tank looked like it had not been used for some considerable time and had a much thicker layer of granulated size deposits coating the bottom, together with more rust under the lid.

Where's there's muck there's volunteers!

Both are now ready for a full clean and repaint before being put back into service.  The old plastic diesel tank has now been disposed of. 

At the end of play we gathered all the hydraulic hoses together for safe keeping.  It is hoped to redeploy some of these in the up and coming rebuild phase.

31 December 2018

388 CCT Volunteer Stories in 2018

Many thanks to all of you that have typed words and taken a few pictures, all your contributions have been really appreciated.

Our volunteers do so much and there are still projects going on that have not been mentioned.  It all goes a long way to provide up to date information between the groups and also to our armchair volunteers not able to get out and help for one reason or another.

Please keep the stories coming in 2019.  There are going to be some changes in CCT's web based activities, but whatever happens, I'd like this platform to continue.

Happy new year to you all,
Peter A.


29 December 2018

Dock Lock Blogged by Severn Trent
(Phase 1B)


Take a wander round their work site recorded during June this year.  Severn Trent have captured their community activities and uploaded it to Google Earth.  Follow the link below and relive a moment in our very hot summer as they upgrade our towpath.

Severn Trent Water Working Party

Also, images have been updated around the area and you can see our dredger Patricia in the yard at Western Depot.

28 December 2018

A Grand Day Out
(Phase 1B)


by: Bob H.

I’m sure that most, if not all, CCT volunteers have heard of the Waterways Recovery Group or WRG.  But I wonder how many have joined in their activities at a work camp or a work party?

I confess that though I’d spoken to them quite a few times, I’d never joined them to work.   I had recently completed a chainsaw refresher course (A 5 yearly requirement by the CCT insurers). So, I decided that a day out doing more varied chainsaw work than our normal “routine” work (which I do relatively little of these days) would be a good thing. So today I joined a WRG group about 40 strong, on a continuing tidying up of the 1b section West of the A38.
 
I met here with Nigel, their CSO leader and soon we were underway trimming limbs and stems overhanging the Canal. We were careful not to remove any Ivy covered trees, we don’t want to disturb hibernating bats!

Ropes were attached


Fires stoked

Team tea breaks and lunch are taken seriously! 

Workboat Stuart provides access when we can’t reach safely from the bank 

And the end result reveals a full width Canal again

After such a Grand day out, I would recommend all volunteers, whatever your skills,  to spend time with such a bunch of folk.
Blast from the Past 3

by: Bob Hallam

You may think, that when in 2018 SVCC sent the Boat Acquisition Team  (AKA BAT Squad) to Etruria to re-float the £5 workboat “Flea,” that that was our first attempt at such a venture.
Not a bit of it!

A short history lesson. During the 1970’s and ‘80’s, a number of work-flats were built by Trust members, with Tony Jones and Richard Attwood amongst others, plying their trade beneath the Railway Arches at Wallbridge. 

After sterling service, one of these work-flats ended up abandoned at Arundel Aqueduct when the Canal was infilled to build the Stroud Eastern bypass known as Dr. Newtons Way.
In 2011 (Feb 9th to be precise) a Western Depot Work Party under the self-same Richard Attwood, were asked to clear up a bit around Arundel, the rubbish tip was shortly to become the new route of the Canal!

We uncovered the long-abandoned work-flat, but a tree had grown right through the deck anchoring it to the bank! An valiant attempt was made to re-float and restore the flat, but we were beaten by rotten timbers and lack of a crane.
LtoR Richard Tanner Richard Attwood Brian Ward Ellison Mike Langford
Unable to free the work flat

Some time later, the contractor digging the new canal route must have lifted it. It was, and maybe still, on the bank towpath side, where the canal again passes over Arundel Aqueduct.   

23 December 2018

Blast from the Past 2

by: Bob H.

Not all our jobs are on sections 1A or 1B

In 2011, a milestone at St Mary’s at Chalford had been pushed over by a large Hawthorn tree root. After being heaved out – all manually achieved, the offending root was carefully cut off and the stone taken to F.J. Cambridge a very friendly Monumental Mason, in Gloucester. 

Since it was a clean and little damaged break, it was literally glued back together with a stainless steel “safety pin” inserted into the centre for security.

The pictures tell the story!
 Richard Tanner looking for the stump
 Mike Langford found the stump
  The stump ready to lift out.
 Mike Langford Cutting tree root out
 Here it is ready to go
Lionel Lusty - The gnome of St Marys Milestone
 Milestone bottom section
 David Cambridge Ponders the repair
 Dennis Cambridge and The safety pin
LtoR Dennis, David and Mark Cambridge 3 generations
Arriving at Site

Colin Parsons is Pleased with the result
 Back in place