23 January 2019

Project 'DNF' - No.5 Refit

Whilst the freezing world around us took on a magical air, when we headed to work this morning, the conditions on No.5 were not at their best.  The sun was clearly going to take a while to get to work on the cabin, so we stripped down the old engine mounts for possible reuse in the warmth of the machine shop.  In the shed, the 1st coat of red oxide was being applied to the hydraulic tank.
Finally, the call came to say that the carrier had finally (3rd try) found the house and the new seat was about to be delivered.
Much thinking and pondering on cab layout then ensued.  We found that if we mounted to new seat on the old seat ironwork, then the position was well elevated.  The holes almost lined up.  We had to drill and tap 4 more to a pitch just a few mm wider.  The base post frame needed modification, a bit chopping off, to move it forward as possible.  Positioning and routing of the hydraulic pipes from the joysticks is our next major challenge. 
The sun before it got to work!

Boaty catch-up

by: Dave I.

Monday was busy! Both Goliath and Delilah were out, being refuelled (thank you, WD!), then carrying on along the cut.  Goliath made it through Ryeford to Upper Mills, and then returned – even if there's no work to do, travel by a deep drafted vessel like the tugs makes a big contribution to keeping the channel clear.  Margaret met the dredgers and helped move full hoppers, so they can keep dredging.

While that was happening, Dave & Myron met Alan at WD to measure the crane we'll be fitting to Delilah. (We suspect we'll be saying a lot of 'thank you's to Alan as this project progresses!) It's rather intimidating, a large and heavy thing hanging in the gantry crane waiting for us to do something with it.  Anyway, the key dimensions were duly measured, so we know how high it will be, so we can make sure it will pass under all our bridges (even Upper Mills); and we know wide it is, so we know how big a hole to cut in Delilah (gulp!); and we know the mounting points, so we know where we need to put the matching locations in Delilah. Easy!

Then we went to see Delilah, to see what those dimensions looked like on the boat itself. Comparing what we plan to do, with what has already been done in Samson was very helpful.  So now we have some drawings, the next steps will be to mark out and start cutting.  We'll soon be needing to draw on the help offered by volunteers interested in helping do the actual work.

Tuesday we went training and trialling in Goliath.  Training someone new takes a fair few trips, and we try to include as much experience as we can.  This time we went to Ryeford and said hello to the dredging team:  Patricia seemed to be doing a great job.

We picked up an empty hopper, attached to it for push-towing, and soon Steve was driving a combined 95 ft vessel for the first time.  He seemed pleased!  We took it to Ebley, where we turned round (not the hopper, it's too long!).  For the return, we decided there was enough width to trial pushing breasted-up.  The additional bollards fitted to the hopper a while ago are essential for this, as a firm and secure attachment is needed fore and aft on the tug. This attachment was achieved, and off we went.

It worked very well ðŸ˜Š. We'll be doing more trials of this and then hopefully roll it out across the team.

On our return, Patricia had filled a whole hopper, so we were pleased to move that along and across the cut for emptying later. 

And finally, if anyone was wondering why the tug spent a while going round and round in circles, it was all part of normal training for manoeuvring at close quarters - finding out how to turn even in narrow bits of canal, doing it without hitting the banks, and getting the confidence that it can all be done with the engine just at idle. 


A Slow Start

by: Buffs

Today yard was as slow to come to life as the day itself. The low cloud which obscured the blood moon during the early hours of Monday persisted into the dawn dashing any hope of seeing the receding lunar eclipse in the time between the siren call of the alarm and the fullness of sunrise. Driving to WD through sunrise is always a differing pleasure, will I be able to see the foothills of the Cotswolds through the mist or will the hilltop trees be etched into the horizon by the barely seen sun?

The ragged start was reflected in the slow increase in the number of volunteers arriving on site. The task list for the day required drivers to go to Ham Mill and Dudbridge on simple but separate jobs. Fuel had to be delivered to the tugs at Ebley requiring a trailer proficient driver. But wait, a phone call from Ham mill. The job needs a trailer to be moved and the nominated driver isn’t qualified. Oh! And by the way can someone go to Gloucester to collect a mixer that Jason has obtained. It will need a trailer to collect it as it is very heavy and can’t be lifted like the others we have. Reg is juggling tasks and drivers until he has to leave for a meeting at 10. It all worked out in the end but it required goodwill and the use of more than one personal vehicle to meet the early day tasks.

Our tasking ultimately comes from Peter Best, Chair of the Stroud Valleys Canal Company. He is takes an increasing interest in the appearance and maintenance of the restored and watered lengths of the canal. He takes time to walk his parish and passes on to WD his observations and tasking for work to be done. One of Monday’s tasks was to follow up on some of Peter’s requests by visiting the sites on his current list to better understand the job and how many volunteers would be needed to complete the job. Jobs at Ebley and Harper’s field will be programmed for the near future.

Whilst I am on the topic of jobs to enhance the appearance of the Stroudwater I must offer a peon of praise to the Wergies who had their Christmas camp with us. Over 6 days a large party of the Red Army, never less than 30 and ultimately 40, set about clearing the banks west of the A38 roundabout. Getting as far as the site of the old aqueduct beyond Stonepitts Bridge a large number of overhanging branches and trees were cut down and were either burnt or taken away as fire wood. Vast amounts of brash and undergrowth were strimmed, cut or mashed and added to the growing number of bonfires. Jasper and Stuart, the two WD built work punts were used to great effect providing stable platforms for the chainsaw teams to work from and to collect loose timbers from the water. I thoroughly recommend a walk from the roundabout to the river bank and back to see what the canal can be as Phase 1B progresses.
There is water in there somewhere…


A before picture from the western end of the section crossed by Stonepitts Bridge. The fallen large tree is on the off bank. To see the ‘after’ picture why not take a walk from the A38 roundabout along this section.

The end of a very productive day!

21 January 2019

Project 'DNF' - No.5 Refit

It has to said that there is little else to strip out of No.5.  But, this morning, the three cross member supports for the old engine and the support shelf for the control block finally got the chop.

The hydraulic tank was also lifted out and once it had been moved into the engine bay for positioning trials, it headed off into the depot to have a good clean, then paint.  The second coat of white paint was applied to the fuel tanks, they are ready to be put back when the time comes.

The old hydraulic tank, now a containment vessel under the new control block was lifted into the cabin and thoughts about the interconnections and mounts formulated.  The floor was also replaced so that joystick and seat positioning could be considered.  The new seat has been ordered, but the carrier has twice failed to deliver, but we do hope to have it available for Wednesday.

We need to repair rust damage to the cab.  To this end, after discussion, we are going to replace a number of the panels with a plastic material, which hopefully, won't rust! 

18 January 2019

SDC Thursday Group

by: Ian Moody

Yesterday saw us splitting the team. One group worked at Gough's Orchard lock, shifting the stones and winching out buddleia roots. The other team headed up to Bourne Lock to do a bit of a tidy up.
At lunchtime I took the opportunity to provide some more hands-in-the-air training. Still a work in progress I'm afraid...




Ham Mill Update - Weds Jan 16th

by: Andy P.
6 folks arrived (Bob, Duncan, Richard, Mathew, Vic and Andy) to find the tree stump finally lost-thanks to Alan J and very strangely, most of the water had gone from the canal. 
This did allow the full size of the collapsed wall to be revealed.  Its big, very big.
A very early 16t load of type 1 was delivered ready for the towpath
First job was to lift and then Bob cut and placed the coping stones very carefully onto the top of the bypass weir.
Then concrete was added to the base to get the correct drainage levels. A very time consuming and difficult job but it does look very nice. The fence was refitted and another job wiped from the to do white board.
In the meantime the temporary by pass tow path was attacked with the mini digger and revealed another tree stump. Positive energy washed over us, as it was not as big as the previous one. However as it was slowly revealed, it was still a metre across with lots of side roots.  The 4 man axe team lined up taking turns. It did not get easier with practice.
As night started to fall and the rain eased off we called it a score draw, us v the stump. But it is moving and has to come out.

Some becoming routine and some new horizons

by: Myron

Wednesday saw the Boat Team fielding three full crews again.

Goliath went through Ryeford locks to carry out a few tasks down towards Stonehouse way. All were completed successfully.

Margaret moved a hopper and then the crew joined the Weedie crew at Dudbridge.  Here, we were happy to find Delilah at the top of the locks, but waited with trepidation for Weedie to come into the pound.  Would it get passed.  It did, easily.  Then with Weedie and Margaret moored up at Wiggals Yard, the two crews set about seeing how far up the canal we could get Delilah in the rest of the day.
Did I mention that Weedie has been brought down to be able to work on fitting the new mesh, which incidentally arrived at WD yesterday.  We hope to do this at the landing stage at Stonehouse Court, where the large flat field right next to the landing stage makes a perfect working area.  Also, Delilah needs to go in the other direction to join up with Samson, which will play a big part in what is effectively change of gender for Delilah, specifically fitting the new crane to it.  Can we really continue to call her Delilah once this is completed.  Have too, as its unlucky to rename a boat while it’s in the water.  Maybe we can nickname it Delboy. There’s another thing, boats being ‘she’.  Not very PC but a fifty foot barge called Samson with a great crane on it, is not the most feminine of images.  Goliath has a similar gender problem in my mind.  I think I’ll just have to settle on calling the boats in our fleet ‘it’.
Anyway, Samson is currently moored just below Griffin Mill lock, so that’s where we had to get Delilah.  This was new territory for it, and quite a daunting prospect, as we would have to bow haul all the way.  This is never the Boat Team’s favourite pastime.   I believe the furthest Delilah has been before was just through foundry lock, but I might be wrong.  The task progressed really well, except for the fact that it started to rain steadily around twelve o’ clock.  It was a bedraggled crew that arrived above Wallbridge mid afternoon.  We’d made excellent progress, so we called it a day and invaded the Heritage Centre for a late lunch and a warm up.  They didn’t mind at all.  It was still raining when we came out, and we still had the walk back to Weedie and Margaret, which then had to be driven back to base and put away.  A very successful day all round.
Thursday found the weather dry and sunny, albeit cold.   Five of us met up, ably assisted by David from the Landing Stage Team.  We were soon on our way, hoping to finish by lunchtime.  Unfortunately, one of our number became quite unwell at Capel’s Mill.  He became dizzy and was really out of it for a good few minutes.  The most expedient way to get him to hospital, was for his wife to pick him up.  I’m very , very glad to say that he checked out ok.  But it was a salutary reminder that we all need to be looking out for each other.
After this set back we resumed the journey East, ‘there be dragons there’.  The twists and turns around Capel’s Mill were actually great fun to negotiate.  Bowbridge lock was a new experience for us, and then Delilah was finally reunited with Samson. The final task was to get Delilah passed Samson. This was so the crane on Samson is up against the right end of Delilah where we want the crane fitted. This was achieved without any great bother. Before setting off back, we had a discussion with Alan to map out what jobs needed doing first on getting the crane fitted.  Anybody good with an angle grinder.  The walk back to the cars was so much more pleasant than the day before, finishing off a very satisfying couple of days