12 February 2019

Joining forces 

by: Bob H.

In the Ryeford to Dudbridge pound, the dry dredging boys have been doing a fantastic job with their Long Reach excavator. 

Meanwhile, the Wet dredging boys have been working Patricia up to speed by clearing along the bit on the offside that the long reach isn’t quite long enough for.   For a short time today, we were VERY  close together.


Patricia and crew can now up legs and move forward quite quickly, so we decided it was a good idea to move backwards towards the lock, picking up an empty hopper on the way. 
Dredging then continued until almost dark - there’s plenty to do up there! 

"May all your combined leaks never exceed your bilge pump capacity. 

11 February 2019

Project 'DNF'  - No.5 Refit

The assembled team today managed a variety of jobs.  Painting featured, as it most often does as did interior cleaning of the cab.  The painted deck plates were installed on a gasket of sealant and tightened down.  At leas the rain water cannot run into the hold now.  Last Friday's, storm Erik, left quite a deep puddle to pump out.
After looking in the obvious places and failing to find the woodruff key for the turret hydraulic motor, it eventually turned up in an unexpected place, but we were pleased it did.

When it came to fit the key, we noticed that the keyway was 3.3mm smaller on the new pinion and required milling down, but tight along the sides (as it should be)  In the old pinion there was 1mm of slack - not good.  A large cover plate that protects the bearings was found to be minus its fixing screws, so had been hanging down out of place.  This we fixed in place with new screws.

The actual fitting of the pinion took a bit of care, especially checking the dimensions of the shaft etc.  In the end we achieved a fantastic fit by heating the pinion to about +80C so that it slipped nicely over the shaft.  When cool, it will be a very tight fit.

The motor assembly was then lugged into position.  It is very heavy.  Now back in place, we just need to secure it down.
All the holes in the deck that once had various hydraulic fittings have now been filled and sealed with coach bolt heads.  The largest was the return pipe to the hydraulic tank, one of the largest trip hazards.  
Late in the day, the hydraulic tank was extracted from the barn and placed in the hold.  Mountings are required for this. 
Four Get Wet in Whitminster

A late message on a phone “Can you help out at Whitminster on Friday. We need an extra pair of hands as we reduce a couple of overhanging trees below Occupation Bridge” – reply “Isn’t going to be wet and windy?”- “It’ll be ok we won’t be out too long”

So began a three hour soaking in the best that Storm Erik could throw over the West of England. It was very windy and very wet. The wind that blew from east to west along the line of the cut had become all the more fierce as it rushed over the water unhindered by the extensive clearance of trees and undergrowth by the WRG Christmas campers. One of the intrepid four had to bring Workpunt Stuart from its mooring East of Occupation Bridge through the arch to the West side. The boatman had to paddle and push to coax the boat into the deeper water for Stuart was warm and dry by the bank and didn’t want to play in the windswept water, neither did Stuart want to get his deckboards wet. It was with a series of wind driven pirouettes on the water that progress was made to the bridge where a helping hand was waiting in the deepening mud to haul the boat through the arch. Set free on the wind Stuart came to rest on the pipe-bridge as the still in place cover prevented further progress. This was hastily removed and boat and crew slipped under and was drawn and blown to the worksite.

The rain eased a little, a brief respite as the heavens temporarily dried.

The day’s task was to complete the removal of overhanging branches from trees close to the pipe-bridge which were outstanding from the Christmas clearance task. The two saw-men and their willing helpers set about assessing the best way to reduce the branches over the water and bring them ashore for reducing to manageable logs. Ropes were attached to boughs and cuts carefully made in line with the cutting plan until with a creak and a twist the branches fell where they were expected to. The target boughs were heavy and multi forked with nature formed twists which required more cutting. Saw men love their saws and don’t like getting them into the water. The resulting fountains are spectacular but have a habit of soaking the sawyer, the audience has the option of running away which they usually do. With much huffing and puffing and heaving on ropes the branches were lifted just clear from the water for a dry cut to be made and the lumber was dragged ashore for further reduction later.

The rain came again, with malice aforethought, driven on by Erik’s mighty blast. The four were getting wetter and colder…..

 The Workpunts constructed by Western Depot have become a favourite of the chainsaw fraternity as they are remarkably stable platforms to work from and, as the Christmas work party showed, have a good capacity for cut logs which are recovered from the water. The boats are so stable that using an extending pole saw at its full length of 4 metres is as easy on the boat as on the bank. And so it proved on Friday. Small branches were removed from the long target branches to make the felling of the big stuff less difficult. In skilled hands the pole saw can be used to remove branches up to 20cm (8”).
As the storm built to a crescendo the final piece of the jigsaw was undone as the last and heaviest branch was lassoed and severed from its trunk and coaxed onto the bank by three men on a rope and one man in a boat. 

At this point the four decided that incipient hypothermia needed to be acknowledged – waterproof hi-vis jackets have their limits - Dripping rain onto heavy work trousers being one of them. 

The jumble of branches and scrub left on the bank will be tidied by a work party of Scouts from Amberley soon. I’m sure that someone will find time to write a piece for the blog when it happens.

And finally… There are no photos as all the phones were kept well away from the wet. And wet gloves over cold hands don’t work well wresting small flat objects from deep dry pockets. 

10 February 2019

Four fellers foiled Erik
(Phase 1B)

by: Jon P.

The arrival of Storm Erik on Friday did nothing to deter a (fool)hardy team of four that had planned to tackle some stubborn limbs on two trees next to the Government Fuel Pipeline crossing the canal at Whitminster.   Previous work had left these four limbs for later removal, with plans to use an all-terrain 'cherry picker', but we couldn't work out how to get one over Occupation Bridge.   This picture shows the scene before any work was done at Whitminster.
It was so wet and windy that we couldn't take any pictures of the work in progress, so this 'before' picture shows one of the trees next to the pipeline in unusually calm and strangely lit weather – if only!  


Our team consisted of Bob H, 'Buffer', Ian M and Jon P – equipped with chainsaws, pole pruners, ropes and grappling hooks.   The weather was so atrocious that even the farmer had stayed at home, so the arrival of the Mitsubishi pickup convinced the cows that we were delivering their daily haylage!   After fighting our way past the inquisitive cattle and donning life preservers, Ian and Buffs went off to fetch work boat Stuart to the pipeline.   This was to act as our work platform, as the two trees were hanging out over the water.   By judicious use of the pole pruner at full 4 metre extension, we were able to reduce a fair amount of weight in each limb.   Then, with ropes attached and taking up the strain, Bob cut through the limbs leaving a 'hinge'.   This meant we could pull each limb in the correct direction away from the pipeline.   The felled limbs were either dragged up on to the bank or left in the channel, and the plan is for the SDC volunteers to cut and stack everything on Tuesday.

Despite wearing life preservers as a precaution, at the end of the session we were as wet as if we'd actually fallen in! 

07 February 2019

Ham Mill 6th Feb – A New Canal Emerges
by: Matthew J.
It was a slightly quieter start to proceedings on Wednesday, with Bob, Duncan, Matthew and Julian mulling over which jobs could be progressed while awaiting the arrival of the Slightly Bigger Digger (SBD) and the piling barge gang next week (hopefully…). Matthew and Julian were initially despatched for a little light gardening where the fence along the towpath needed clearing and repairing.
Meanwhile Bob and Duncan battled on with some further trench warfare towards the top of the sloping towpath. This is now as far as we can get with the mini-digger – it’s an impressively deep hole already, but we’ll need the SBD to finish the job.
So this just left the section under the bridge itself to be dug out. Unfortunately the retaining wall at the edge of the towpath is extremely porous, so water was filling the hole as fast as it could be dug out. The rest of the team were engaged as navvies to barrow out the resulting gloppy mess, while the digger bucket required frequent washings in the canal.
The final stage of the work was to remove the coping stones at the point where the bypass pipe will re-enter the canal. As a result we can now proudly announce the opening of the new Bob Ambury Branch of the Thames and Severn Canal. Admittedly it is somewhat limited in the size of vessels it can accommodate, and we will have to work out a way of getting water to go uphill before we invite HRH to open it….

No Satellite Reception under Dudbridge Bridge

by: Bob H.

We know that when a flood event washed out the towpath and lock side a few years ago, that debris washed into the canal under and a little beyond the bridge. We really need to know how bad it is down there.

 Following on from the depth survey yesterday, Mark from Land and Satellite Surveys came back early this morning to do a little “tidying up.” He had checked the data from yesterday and since it looked satisfactory, I asked if we could please have a look under Dudbridge Bridge.

  
However, he couldn’t use the “direct from Satellite GPS” technique we used yesterday. So how then?

No problem!
A clever set of kit consisted of a GPS receiver which also shines a laser at a target.
In this case the target is a prismatic reflector on the top of the little boat (which also has the sonar depth sounder)
There’s the boat up by the lock gate. 
And of course, it’s always good to drive another boat, so Bob just HAD to have a go.


New CCT Boat

by: John S.

Dredging this morning we couldn't decide how to get tea and biscuits to the opposite side of the canal, for dry dredgers Les and Andy. 

Brain wave. Sail them across on a plank. So, carefully loaded mugs and biscuit box was gently launched, and even gentler received on  the other side. 


We've yet to name the new vessel.
(Sponsorship anyone? ….ed)