The ending of Patricia
by: Bob H.
That made you look, as really this is the end of the beginning, not the beginning of the end!!
Over the last year and a bit, we’ve kept this wonderful blog informed of our experiences with obtaining, rebuilding and refurbishing, then working hard on the learning and documenting the very new operating processes and practices.
We’ve had so much help from so many volunteers, it would be unfair to single anyone out. We can never thank you enough.
It’s taken us a couple of weeks to do a few final bits of documentation tweaking, but our Chairman, Jim White and H&S director Laurence Bryant, formally and physically witnessed our (written) operating procedures. This was carried out while “live” dredging took place. Following from this, they then gave us permission to put Patricia into (almost) unrestricted service.
We are now familiarising our WRG “22” operators and commencing training newer recruits. To enable a more structured approach, we have written and had approved a comprehensive training syllabus. When our assessment control sheets are complete, we will have a formal process to make our training as safe and efficient as possible.
So in a little over 13 months, we’ve taken a lovely but tired Dredger and transformed her into an incredibly useful and comfortable to operate item of plant. Hopefully, Patricia will serve us well for many years to come.
To this:
From this:
And, like an iceberg, most of what went on is under the surface!
01 February 2019
Keen volunteer disappointed
Newly recruited volunteer Sid Frost (AKA Frosty) was bitterly disappointed this morning when, after walking in the air, no one met him at the Western Depot.
"I'm so used to this weather, I can't understand why we're not out cutting grass and hedges. I mean, all properly kitted out with helmet, hi viz and ice toed boots, I'm ready to go. I must say though that I hate the hot sunny weather, it makes me sweat so and I lose so much weight."
Hopefully things will return to normal on Monday.
A Scientific Discovery!
by: Ian Moody
Thursday, and the task was to do some towpath repairs at Ebley to eliminate those pesky puddles. However, our usual methods did not seem to be working. As we all know, we live in a hard water area but this was something new. The water was so hard it defied all efforts to sweep it out of the way with the broom - it's almost as if there was some temperature-related effect happening. Not to be deterred we went at it with hand tools, confident that we could remove the offending stuff in large, friendly pieces but it was not to be. The main effect was to fill our boots with very small and somewhat cold shards of ice. In the meantime, the away team were reporting that their shovels were just bouncing off the pile of topping material that they were attempting to load onto the tipper. This was not going well.
We regrouped and brainstormed. The absolute best idea was to abandon ship and reconvene in the nice warm coffee shop. The second-best idea was to try spreading some salt on the puddles. This idea was so good that I immediately and inaccurately claimed the credit for it. A quick sprinkle later and we were back in business. It turns out that ice plus salt equals water. What a discovery!!! We'll be communicating our revolutionary findings to the scientific community.
Meanwhile the away team had managed to mine their way into the softer middle of the aggregate pile using only brute force and persistence. At this point we were joined by staff and pupils from Thomas Keble school, eager to get stuck in. Soon we had an advance salting party and whole bunch of brushers, barrowers and levellers following in their wake. And thus, after an unpromising start, we found a way to get the job jobbed.
Finally, spare a thought for the swans who briefly entertained us by landing on the thin ice, which then gave way leaving them sitting there for a while wondering why they could not paddle forwards. They worked their way through eventually but if they are going to do much more ice breaking they seriously need to redesign their prow.
31 January 2019
Ham Mill Jan 30th 2019.
by: Andy P.
I read that other volunteers may be slow starters in the
cold and are fed on jammie dodgers. The frozen foursome this morning were at it
by 08:15 after a diet of foxes specials and chocolate hob nobs. It was mighty
cold but we could spend all morning walking on the mud-did not try the canal
water this time.
Bob started by cutting some pointy bits on the bottom of the sheet piles. Note that these are proper big sparks.
The dumper was fired up ready for some external maintenance
and repairs.
The temporary (1) sloping tow path is now in full time use
but folks still get a bit lost sometimes.
Duncan, Mathew and Andy began on the temporary (2) canal
side tow path. Temporary (3) posts were knocked into place with the 2 man post
basher. Then temporary rails (3) were cut and screwed in place. Then temporary
(4) trench boards were fitted into the temporary (5) hole behind the non
retaining wall.
Dave and Rich returned the mini digger, from engine lifting
duties, where it continued to level off the new temporary (6) tow path by the
lock. No matter how many times if was levelled it always sank some more when
driven over.
I was nice to see Mike and the bench fitters and have a
quick catch up.
We quickly broke up the remaining, what has turned out to be
the temporary (7) concrete ramp before the jack hammer was returned.
The original temporary (8) lock side trench boards were
moved to their new temporary (9) position alongside the fence.
The temporary hole (5) was filled in to form a new temporary
(10) level surface to meet up with the other temporary trench boards (9)
shortly.
A temporary sort of day but it’s all part of the plan and the
mud won again despite the canal still being frozen on the way home.
30 January 2019
Project 'DNF' - No.5 Refit
When it's -4C, working with metal is not the first choice of activities, but this is what we set ourselves to do today with the expectation that the sun would thaw things as the day progressed.
Two major tasks were achieved today. Firstly, our new engine duly arrived at 09:00. It was lifted straight off the pick-up and taken over to No.5 to be landed in the engine room. Various items associated with it were unpacked and discussions over a cup of tea, ably supported by Jammie Dodgers, helped us formulate our plans for engine location within the boat.
By the end of play today, all the drilling was complete and the whole assembly was fixed inside the hull using components that once supported the old engine.
Secondly, the joystick support assembly, which consists of a number of components fabricated last Monday, was welded together and trimmed to fit in the cab. It is a substantial structure, probably complying with Admiralty standards, but one which should be very sturdy in operation.
Adjustments were made to optimise its position relative to the seat. All that remains is to drill and tap the pivot points in the cab structure and provide a latching system to lock it in one of two positions. The whole joystick assembly tilts forward to aid getting out of the seat. We also intend to fit a switch to detect it being moved so that control circuits are disabled for safety reasons.
Late in the day, two large pieces of 6mm tread plate arrived. These need cutting to size, drilling and painting to cover the areas where the capstans once lived and where the hydraulic oil tank resided. A job for Monday, snow and ice permitting.
The team really enjoyed a fantastic days effort, so rewarding when major milestones are achieved.
When it's -4C, working with metal is not the first choice of activities, but this is what we set ourselves to do today with the expectation that the sun would thaw things as the day progressed.
Two major tasks were achieved today. Firstly, our new engine duly arrived at 09:00. It was lifted straight off the pick-up and taken over to No.5 to be landed in the engine room. Various items associated with it were unpacked and discussions over a cup of tea, ably supported by Jammie Dodgers, helped us formulate our plans for engine location within the boat.
By the end of play today, all the drilling was complete and the whole assembly was fixed inside the hull using components that once supported the old engine.
Secondly, the joystick support assembly, which consists of a number of components fabricated last Monday, was welded together and trimmed to fit in the cab. It is a substantial structure, probably complying with Admiralty standards, but one which should be very sturdy in operation.
Adjustments were made to optimise its position relative to the seat. All that remains is to drill and tap the pivot points in the cab structure and provide a latching system to lock it in one of two positions. The whole joystick assembly tilts forward to aid getting out of the seat. We also intend to fit a switch to detect it being moved so that control circuits are disabled for safety reasons.
Late in the day, two large pieces of 6mm tread plate arrived. These need cutting to size, drilling and painting to cover the areas where the capstans once lived and where the hydraulic oil tank resided. A job for Monday, snow and ice permitting.
The team really enjoyed a fantastic days effort, so rewarding when major milestones are achieved.
A Sad Departure
by: Buffs
Monday saw the final departure of the Transit van which had
been the transport workhorse of WD for 11 years . The 5 seats of the van had been
the mounts of the many and varied volunteers based at Eastington. The covers
stored the dust of the canal worksites carried on the trousers of the
volunteers as the Stroudwater was brought back to life. The wooden floor of the
load bay scarred by the many and varied loads of tools, benches, mud rimed
buckets and the detritus of a day’s work being brought back to WD. It also brought the tables and chairs which
filled the old caravan and now the palatial all-purpose base for the burgeoning
number of volunteers. Before the van left we carefully recovered some souvenirs
– the carpet pieces used to soften the burden on the rusting floor, the
batteries which will be re tasked, the jack, which was only recently put to
good use on Dredger No5 and the rear passenger seats.
We waved farewell as she was dragged hesitantly from the
yard to her final date with the fiery furnace to rise again phoenix like from
the flames as a bean tin or a Rolls Royce…….
Workpunt Jasper keeps snug under her green blanket. She is
in the yard for some upgrades based on user feedback.
The cold of winter mornings flushed with frost lingering in
the shade until lunchtime has reduced attendance to a hard core of stalwarts. These hardy chaps and chapesses can be slow to arrive but then it takes so much
longer to layer up to keep out the cold and, this week, the biting wind. There
was an anticipation of fallen trees sent tumbling by the weekend high winds but
as with the previous two windy weekends there were none on our patch. David,
our logmeister, has kept the logs team busy with donations of wood from around
the patch to be collected, reduced to saleable size and stacked to dry. There
are also a number of deliveries to our more regular customers to be made.
The regular readers of this blog will know that the yard is
seldom quiet. Sometimes it is the rasping call of rooks and more often the
raucous scream of an angle grinder on steel. Occasionally the angle grinder in
the right hands can provide an impressive light show. While Andrew was
providing the musical accompaniment for workers playtime he added a spectacular
light show. The sparks generated by from a higher carbon steel he was cleaning
up turned the grinder into a Catherine wheel lighting up the darker recesses of
the workshop.
29 January 2019
Ham Mill - 28th Jan 2019.
by: Andy P.
A really cold start, for the 7 of us, but it did allow the
mud to be walked on for a change. The Mini digger and trailer had to be rescued
from where it was left or rather dumped by the last users.
Duncan, after lots of greasing, finally started digging out
behind the non retaining wall and creating space for the other
temporary tow path along the lock side.
The spoil being dumpered away-sorry the only
place left was to put it in the canal.Jason, on big digger, began clearing the canal where the 2 dams were, in order to allow a boat to pass towards the bridge. A new temporary career for the boat has been agreed. Fuel has to be manually carried over to the now trapped big digger.
It’s a long time I suspect, since the canal looked so open. Looking good down towards Griffin lock
Maurice, Richard, Mathew and Andy found rails which were cut,
spliced and screwed onto the temporary tow path posts. The towpath under the
bridge was blocked off at both ends and suitable signs put in place. Then Bob
set about cutting 2 grooves along its length and up the slope to mark out where
the overflow pipe was to go. Then the jack hammer made an appearance for the
rest of the day. It being used on a shift basis, to break up the concrete which
was carried away in the mini tracked device-this seemed to have a mind of its
own on occasions.
Dave and Rich arrived with the last piece of pipe and went
off to get us much needed fuel top ups.
They then set off down the track to Griffin lock but the
famous now gooey mud, refused the let the tipper past. So all hands were called
to push it along its way.