28 February 2019

The Boat Team - Wednesday 

by: Myron

Wednesday saw two boats out, both pushing new boundaries to some degree.  The weather was glorious and very conducive to boating.

Weedie was carefully taken through Dudbridge Lower under the careful of of Ian Moody, to then be taken on quite a long voyage to Stanton’s Bridge pound to continue the deweeding in that stretch which was curtailed when the old mesh broke up.  I was at a bank side meeting at Marling Field, which was to try and sort out the various thorny issues surrounding the use of this fields for dredging this summer.  It was gratifying to see Weedie come passed, resplendent with her new mesh.


 They went on to take a load out of the above mentioned stretch.  This is the first real use of the new mesh in service, and all performed as expected.


Meanwhile, after the meeting had finished, I caught up with Margaret, messing about with a hopper down Ryeford way.  We had a couple of hoppers to move for the dredgers later on, so we carried on playing with the empty hopper we had.  For a few weeks now we have been experimenting with moving the hopper with the tug breasted up rather than pushing.  This was my first opportunity to try this and after a few coupling and uncouplings, I must say it is very successful.  It gives a fast turnaround and the combination is very controllable.  You will need a good depth of water if you have a laden hopper, but as an experiment we did get all the way up to Ebley in this setup, only getting a bit stuck a couple of times.



 We finally delivered the empty hopper to the dredgers and took the full one away.  As a bonus Malcolm Webb was assessed for his tugging with Margaret endorsement.  That makes seven skippers now who are fully trained on both tugs for hopper and barge moving. A very useful day.




Apologies for not including much about Wookey Hole.  It has to be said that we won’t get much done with integrating them into the team until Wookey’s new outboard is in service.  I understand there are some modifications that need to be done before it can be fitted.

On Thursday, Chris Drake and myself were at Griffin Mill to do some work on Delilah.  Alas this was not to be.  After years of reliable, although noisy and smelly service, the faithful old Lister on the hydraulic power pack, absolutely refused to start.  Eventually, Alan and his gang decided to decamp to Brimscombe Port to do some work there.  We went along as we also had the alternative of preparing the new large beam for the crane on Delilah, which had just been delivered.  Here is a picture of Chris grinding out one of the slots in the beam that is necessary to the design.  So, a useful day from a bad start.

Ryeford gets closer

by: Bob H.

Well it does if we’re going backwards! 

The Wet Dredging Team are getting more and more familiar with operating our Patricia. Now we regularly move off our current mooring, go and collect an empty(ish sometimes) hopper and move to our dredging site with it attached. No problem - so long as we move slowly. In reverse! 


Today, 3 stalwarts started prompt at 08:30 and performed start-up checks, collected the hopper and went off - backwards - towards Ryeford Lock.  This is getting closer as we press on.

 A few months ago, we rediscovered a pair of stormwater drain outlets. Now these were installed we think before the canal was partially restored in this area. Around them is a concrete apron which protrudes into the channel, a lot of stones and granite sets ( which we are leaving) and the remains of yet another bund. That’s hard work to remove!! 

After a good day, another hopper full was delivered by the Tug team to the unloading point, an empty one left for us to fill on Monday.
The drain drain outlets are in the near distance with some of the temporary markers around the apron. 

So, onwards and backwards (for a few more days) then we work on again with hopper on the other side an forwards past the landing stage. 

"May all your combined leaks never exceed your bilge pump capacity. 

27 February 2019

Project 'DNF' - No.5 Refit

Small team today, but good progress made in the never relenting sunshine.  Out on the boom, jib & turret, the remaining areas of green paint/bare metal were treated with red oxide.  The transformation into yellow beckons soon, if the weather holds.

A while was spent measuring for the diesel pipes and their associated connectors.  Following a trip to the plumbers, we now have connected the fuel tanks to the pump and to the engine.  All that remains is to cross link the two tanks at their lower connections.  For this, we need to order a length of fuel delivery hose, so should have that by Monday.
During the day, white van man delivered the sheet metal and 'U' section channel for the cab repairs, so this will be an action for Monday.  The plumbing in the engine room is being placed so that a proper non slip floor can be installed.  Plenty to do.....  

26 February 2019


Ham Mill Mon Feb 25th
by: Andy P.
A chilly start for the 7 of us, greasing, oiling and refuelling the diggers before we disappeared into the trenches.

Some more of the wall was removed and shipped away whilst the bank was used as infill around the trench box.  The hand digging and bucket lifting rota was reformed as we dug down to water level as we wanted to get the next bit of pipe installed.  The other wall side was showing signs of slipping so BD quickly sorted that out with a couple of scoops.  A bit of external shovelling revealed some long buried grass as we worked in the first T shirt weather.

We pre assembled a short length of pipe and a collar before it was lowered into the trench box.  It was just the right length to fit in the box.
I wish the people who made the video about the pipe just pushing together could have been here to see all the efforts we made.  Bob applied plenty of lube to help with the push, but BD failed as not enough room, strong folks pushing had no effect, sledge hammer was barely helpful. 
So the big straps were extended and fitted and slowly the pipe was squeezed into a position. However we ran out of time and did not quite finish it. Therefore, it's plan B on weds. 
A fly past and the big boss watched over us and we rescued, yet again, a frogtoad.


Deep into Cotswold Canals Connected.

(Phase 1B)

by: Bob H.

We had a huge success with a Bathy survey a few weeks ago. In layman speak, this was measuring the depth of the water, comparing it with the desired canal depth and profile, then working out how much silt is to be removed. 

All of our previous survey was done using serious technology. That included Global Positioning Satellite (GPS), Sonar, WiFi, Bluetooth, Mobile Phone data, digital mapping and a little Radio Controlled  boat. Quick, highly accurate and fun!! 


Today, we returned to a more traditional method of trundle wheel, stick and string! 
So in the fabulous scenery between The Ocean and Pike Lock, we dipped and measured, measured and dipped.   Bob H. did receive a few surprises, all was not as he feared. There is a possibility that he will become redundant before he was expecting to be. (Though that’s in doubt.)

Next, the “in water” section West of the A38 roundabout. This section is so attractive already after our WRG friends visited over Christmas. 


Now we can see the water surface (A walk along here is highly recommended!) more dipping and trundling and the initial data measurements was complete. 

The really clever bit now though is to feed the numbers into a computer programme. 
We await the results with interest! 
 

25 February 2019

Project 'DNF' - No.5 Refit

February knows no limits, ice first thing, but could well have been summer this afternoon.

We had three sort of sub teams operating today.  Firstly, the cab repairs have been started, we cannot hold out for something else which may take load of effort to make fit.  There is considerable metal worm in the lower panels and frame.  Attending to these has been simplified by elevating the cab.  Metal is on order as there was none of the right size squirreled about the yard.
The boom and jib were Gunked and pressure washed this morning, with the sun drying things out nicely.  After a good rub down, almost a complete coat of red oxide has been applied.  Yellow will probably be the final colour.
Down in the engine room, we managed to cut two large holes in the hydraulic control valve containment tank.  These are for the main pump feeds to the block.  Not easy access and very noisy.  The tank was also placed on rubber shims in case of any vibration movement.  The control block was finally fixed in place on its angle brackets.
At the stern, the hydraulic oil tank was also treated to some shims of rubber.   Along side the engine, we affixed the battery carrier to the engine stretchers, right below the starter motor stud connections.  There is still the battery isolator mount.
During a dull moment in pressure washing department, the site steps seem to have customised!

Warm and Busy at WD

by: Buffs

Western Depot has been shaking off the coils of this curtailed winter over the last two weeks. We mark the winter solstice with a waved handkerchief as several of the regulars jet off to warmer climes for an extended sojourn in the sun. remaining can oft be found warming hands around the workshop stove before returning to the jo Those bs of the day. This year’s very clement weather has been welcomed by our hedgerow neighbours find their voices of spring. Here and there the swans politely remind their offspring that it is time to leave by chasing them along the water and more. The ducks are starting to pair and the rookery by Pike Lock is coming back to life. Some hardy volunteers have removed some outer layers and a pair of naked arms was spotted after elevenses. The first knobbly knees of the new season cannot be far off. 

As the day warms so does the yard. Even with the reduced winter roster there is much to do and the yard often rings with the sound of the angle grinder chorus. Last Wednesday the chorus was so large that there was a queue for the sonorous tools. 

The big task of recent weeks has been the removal of some of the trees on Whitminster roundabout on the A38. This is the second big task for phase 1b that WD volunteers have supported in recent weeks. There is more detail on this elsewhere on this blog but WD fully supported the logging team by collecting 10 tipper loads of logs to be converted to saleable size for drying and sale next burning season

Jasper has been in the yard after a successful campaign over the Christmas holiday at Whitminster. She has been modified to have a similar internal arrangement as Stuart which should make handling the boat under power much easier for the boats crews of which there are many. Jasper will next see service supporting a Wergie forestry team who will be climbing in and reducing a very large overhanging tree at Blunder Lock in the near future.
The crew of Weedy have completed their replacement of the mesh conveyor on our weed cutter. They have returned the old mesh to the depot for disposal. With our recycling hats on we have yet to decide its fate as it appears to have further use providing temporary matting over muddy footways on worksites in the future. 

I have mentioned already that this week has been a heavy week for our angle grinders. Angle grinders can be fitted with a variety of discs and other tools to suit the job in hand. One large task where they have been deployed is the preparation of the engine cover for Dredger No 5. The job was to transfer the green paint from the cover to the volunteer on the end of the grinder whist adding to the syncopated and cacophonous music of the day. Here John demonstrates successful transfer of paint from the cover onto his person.
Gill, working with a black painted cover has been more successful. Her white trousers are now a battleship grey.