Access through Wallbridge Lower Lock will not now happen until Monday as the chamber is still blocked with scaffold etc. Bowbridge Lock is now full, but with not quite enough flow to to take the level over the spill weir.
The long reach diggers have now almost completed their work above the bridge. The dredging spoils will be emptied from the barges along side this section