24 January 2018

Dredging Report No.1
(Tuesday)

Day started with a hopper stuck on side of Canal. 3 teams worked together to haul, push and in the case of the Dredger lift the hopper.
After an hour the hopper was hauled up to the Dry Dredging team where the long reach unloaded the dredged material to bank.

The teams then work together to reposition an empty Hopper and the Dredger pointed West to start offside Dredging.

Surprising what people throw away under a bridge.  

Andrew