Pages

21 February 2018

SDC activity yesterday - Wallbridge Lower Lock

by: Ian Moody

Yesterday the SDC volunteers continued their work at Wallbridge Lower Lock. The coping stones are now set in concrete and the adjacent the path is ready for its top surface. We have some tree saplings arriving soon which will be planted along the top of the bank.



The brick quadrant is about 75% complete and the final few posts of the security fence have been installed. Thanks to Andy at the depot for extending two of posts for us.