Pages

09 March 2018

Pat's Progress

The new sink/hob combi has arrived.  The old sink unit has been extracted from the cabin, together with what remained of the old coal stove installation and we will now need to design in the new unit together with the water services.  These do not exist at present, so new water/heat provisions are in the plan.