23 March 2018

Pat's Progress

Today, the weather was bitterly cold, so inside work was in order again.

The 12v electrical wiring needs a little modification, so Vince, having set to on the task last week, showed his skills with the switch mountings for the new bilge pump switches


With the new bilge pumps, they will allow automatic operation as well as manual.   Checking out more of the wiring, the work continues. 


The "Ratchet set to Tighten," now looks much closer, the painters moved in to prepare the facility cabin floor. 

Trust me, these two are experts and come to us highly recommended, moving to us from the newly built work boat "Mole."

Bob Hallam.

"May your bilges always be dry and your anchor always hold."