Pages

11 May 2018

SDC Thursday Team

On Thursday the SDC team were once again at the Eagle Mill Close ramp site, continuing the fence and the earthworks. 

As part of the project we are fitting an angled gate leading into the play area, which caused a bit of head scratching at first but we now think we've sussed out the best way to do it. 

On the towpath a small team continued installing the edge boards, hampered by tree roots, concrete and uneven coping stones, and an even smaller team took the opportunity to trim the vegetation along the bank in both directions. We also met the new Bowbridge lock keepers who arrived to cut the grass and tidy up the sides of the lock so the whole area is looking much neater now. Another great day!