SDC Tuesday Group

by: Ian Moody

Sadly no pics from the main group activities at Wallbridge yesterday. The block work wall is all but finished and the unfeasibly heavy gatepost has been moved and concreted into its new location.



Over at Saul Junction a small team worked on workboat Flea removing the remaining silt, now thankfully dust rather than the slurry we previously had to deal with.
We also cleared out all the junk from the front lockers and sorted through the flooring planks to assess how many will need replacing. 
We’re going to be able to save about 80% of the flooring in the main section but unfortunately nothing could be saved from the cabin.