17 October 2019

Wednesday Dredging East of Ebley.


by: Andrew R.

We've dredged along the wharf wall and to the end of the landing stage two metres wide min and at full depth in the last 3 dredging sessions.
We have been digging out up to 600 mm - 2 foot of silt every bucket. As we now know now Margaret is enjoying pushing full hoppers with ease.
It would be much appreciated if vessels with motors pass slowly along this stretch so the excessive silt does not get washed from the higher middle level to fill up where we have dredged.