16 January 2019

The Bench Team head west

by: Will F.

This morning, the flat bed Transit was readied and many men were gathered together in the yard to help lift two benches onto the loading deck for an onward journey to Saul Junction, on the Gloucester & Sharpness Canal, where they were duly installed.

Family celebrating Pat Pewsey

Bench in honour of Dario and Beryl Burton.
Project 'DNF' - No.5 Refit

Workforce numbers were a bit down on Monday. but much was achieved.  The turret was on final approach last time, so our first job was to reinsert the jacks and perform the final docking manoeuvre.  Something more akin to the shuttle connecting with the International Space Station!  

We had a good grip on the various vectored forces we could apply to shift the turret in all planes.  A stage was reached when there was a gentle lowering followed by a most gratifying clunk as the mating faces sat perfectly aligned.  We were half a hole out on the slew ring gear, so a tiny lift to free the ring, so that it could be rotated slightly, did the job and all the bolts inserted and tightened.  They still need the application of a torque wrench.
Next on the priority list was the mounting of the hydraulic control block in the old hydraulic oil tank, now reused as a secondary containment vessel should there be a leak.  

This involved making a couple of right angled brackets to mount inside.  Firstly, a baffle plate had to be cut out.  This proved quite difficult using disc cutters, so the rather dusty plasma cutter from the welding bay was deployed.  What a fine job it did too.  With far less fuss, the baffle was extracted.
Another area of restoration pondered over today, was the repairs to the rusty metal panels at the base of the doors and the cabin.  Here, we need to let in some new metal.  The sheet material is available, but due to the nature of the repair, we do need a fine day to do it.

A good days work by all. 


15 January 2019

Ham Mill Update - Mon Jan 14th 2019
by:Andy P.
Duncan started to repair the broken garden wall and we (Bob, Maurice, Mathew, Richard, Andy) all went into the garden to move the shed back a few feet. Dangerous.  Gravel moved up to the back of the shed, plants and pots moved out of the way, shed emptied again and mini digger gently pushed the shed back.  Lots of levelling to get it finished.
More plants donated to the bank.  More trees and plants were dug up and moved to the bank.  More trees were taken out of pots and planted in the garden.  Mill stones moved.  2 horses repositioned.  Washing machine moved. Caravan moved and levelled.  More soil found and put into the holes left by the moved trees.  Washing line is now accessible.  We are a helpful bunch and the neighbours are very pleased.  Even Dino seemed content.
A new home has been agreed for the 17 very heavy stop blanks.  About as far away as possible of course.  Tried a 3 or 4 man carry but gave that one up in favour of hauling them on the dumper and using Bobs supreme driving ability he got them as close as possible.  The numerous fence posts appeared, along with a dingy, were all neatly stack and covered.  Created room for 3 more cars now. 

Dave and Les arrived with the screw piles and hydraulic machine.  More seriously heavy stuff but a home was found.  They also took another tipper load of metal away-thank you.
Cleared the area behind the bypass fence to keep the other neighbours happy.
A plan and route has been agreed with John P. who, with his team, will re-install the towpath along the canal side when the final bypass pipes are installed.  So a last job for the mini digger was to start to make a pathway to follow the fence lines
A good mixed up day and the tree stump had its last day off.


A Tall Story 
by:Bob H.

Tuesdays are designated as our Dredger Training Day.
 
Today was a little different as we needed to carry out some maintenance as well.  With the weather having thankfully been dry, we decided that since the bilge pumps (three of the set of four) have proved intermittently unreliable, we have a go at fixing them.  Deck plates lifted (and screws regreased for next time) we cleaned out two of them and installed a new one for the third position.


That done, we also fixed the tiny leak on the exhaust pipe with good old-fashioned “Gun Gum.”  With that too successful (the smoke alarm in the engine room is VERY sensitive!) we continued the familiarisation of two more experienced operators.

In contrast to yesterday’s post about Dredgman Derek, one of the trainees today was John S. At 6ft 4inches, his bump cap is necessary! 

The hopper is now full and ready for the tug team and the dry boys to empty it. 



"May all your combined leaks never exceed your bilge pump capacity.

New Dredge Crew recruit

by:Bob H. 

The working up to speed of Patricia continues as we gain more experience and develop our techniques.  Today above Ryeford we continued clearing along the offside of the channel. 
The silt here is well compacted and contains a little foreign debris as seen here. 
Today we were joined by a new recruit.  Small in stature but big on detail and compatibility. He doesn’t argue with the Instructor and keeps his hands firmly in his pockets! 
He’s not very good at making tea though, despite full PPE including life jacket, high viz and helmet with CCT logo. Tim K had to show him the best way while Bob H was at the controls. 

So everyone, say hi to Derek the Dredgman.   Lovingly and skillfully made by Sam Sirett. 


14 January 2019

 Project 'DNF' -  No.5 Refit

Work continued on two main fronts.  The remaining bits and pieces left in the control cabin were removed leaving a large empty space ready for cleaning and later painting.

Some time was also spent un-crumpling the crumple zones on the cabin roof!  These had been bashed more than once by the boom.  The metal was quite difficult to flatten.
On the turret, the remaining 1.5 sheared bolts were finally extracted and threads re-tapped.  This meant that the process of replacing the boom could begin.  Àfter sourcing 20 new M18 nuts, we clamped the bearing ring in place, tightening all the bolts evenly. 
There then followed a very slow and careful exercise to lower the turret down.  Using a combiration of jack's and packing pieces, it gradually inched closer to its landing point.  Daylight ran out, so we will continue on Wednesday.   The original lift was done using a HIAB.  The ring gear has now been turned 180 degrees so that we wear a new bit! 

Chestnut Lane wig-wags

by: Frank L.

Following a period of construction and testing at Wester Depot,, the  new control equipment was loaded and taken to Chestnut Lane where Jeff and Frank attended Gas Works Bridge to complete the power change over on the towpath unit.

A bit of Lego building was required, but job completed and bridge swung just to proof test the system.