14 January 2019

Chestnut Lane wig-wags

by: Frank L.

Following a period of construction and testing at Wester Depot,, the  new control equipment was loaded and taken to Chestnut Lane where Jeff and Frank attended Gas Works Bridge to complete the power change over on the towpath unit.

A bit of Lego building was required, but job completed and bridge swung just to proof test the system.