Please forgive our enthusiasm for boats, but there's no getting away from the fact that they are what the navigation was built for!

Both tugs were out on Monday, doing a little hopper moving, a little training, and a little keeping the channel clear.  Here's an unusual picture of them together in Ryeford Locks. 
Preparations for mounting the crane into our wide beam barge Delilah have started.  The hatch into the  compartment where the crane will be mounted was opened, and we found it'll need to be emptied:
And now we know where the first cuts will need to be made. Hopefully we'll be doing this next week.  Once we have a hole, the next task will be to weld edging all round.  We'll let you see what it looks like as soon as we can. 


28 January 2019

Project 'DNF' - No.5 Refit

A good team gathered this morning with the first and essential ack of holding a discussion as to how and where we were going to mount the two joysticks.   Their position in front of the arm rests and then shifting them away to a location which permits the operator to easily vacate the seat.  We had the right volunteers in that many were qualified dredger operators. 
Ideas were discussed and sketched, even a hardboard mock-up produced.  Once the concept was agreed, we hunted for materials and then spent the remainder of the day manufacturing the various components which we hope to fabricate into an assembly ready to fit during Wednesday.

Away from the cab, the hydraulic tank received its second coat of red-oxide paint, as did the cab safety rail.

27 January 2019


Digging out for the Griffin Lock lower landing stage

by: David M.



The landing stages team has been working in parallel in two groups this last week or so.  The stage will be close to a high bank, needing steel plates to retain the bank and towpath.  One sub-team has been at Brimscombe doing the hard work of manhandling the plates for buzzing off rust, bitumastic painting, and drilling for lifting points.  They were brought to site along the track from Ham Mill by trailer, to join the OBB piles already in place nearby.



The steel bank support plates will be used two-high at the higher end of the bank and screwed to the rear of the bank-side piles, then back-filled and tamped solid with soil.  Steps up from the stage at the lock end will be formed within a sturdy piled steel box, inserted into the canal bed.


The other sub-team has made good progress with the HIAB crane and clamshell grab, digging out an especially wide and deep stretch of ground.  Thursday started with some ice breaking to avoid making barge-hauling even more energetic.  
The width of the canal means that the barge has to be pushed diagonally across with each load, for the crane to reach high on the opposite bank where spoil is deposited.
Then hauled back again to let the crane get a good grabfull on a short reach.  It’s often too hard to hold by hand, and needs anchoring to the bank.
The first pass was nearly completed, to just below water level, leaving about 1m width in place.  This will be removed in a second pass to about 10cm above water, with piles and backplates being installed as we go, to ensure the bank stays intact.
The grab gets a wash, the crane driver a well-earned break.  A handy piece of kit, in the right hands.

26 January 2019

Canal Project - Community Consultations

Today saw the first of a series of events along the path of Phase 1B where the local community can come and meet the key players involved with the restoration of the canal and its environment.

In Whitminster village hall had gathered representatives of each of the partners, on hand to chat with the public and to listen and record their feelings and comments about the project plans.
Many very informative displays had been set up, some of which were interactive and engaging for all ages.  An air of positivity made for a very pleasant experience with very useful feedback on all the activities placed on record for further consideration.

It was also a first outing for a proposed new logo, one which replaces 'Stroudwater Navigation Connected'.   'Cotswold Canals Connected' is now the new branding name for Phase 1B.  
Next up, it is Eastington on the 2nd February

24 January 2019



Ham Mill Jan 21st and 23rd 2019
by: Andy P.


On Monday there were 6 of us and weds we started with 3, until 2 snow bound folks slid their way to join us. Dedicated bunch.

A slow start as no mini digger and we had to wait until Jeff brought us the hired jack hammer.

Work continued to undermine the tree root, along the temporary tow path, with more axing and cutting until it finally relented, to join the yard wood pile.  Once out of the way we could make progress.  The path was dug out, levelled in a sloping sort of way, until we were happy.  Some suitable long posts were found and installed with the help of the digger and the borrowed post basher.  Trees roots still caused serious mischief.  The wire fence was tensioned and fitted back in place. Reg, in his own car, made an emergency delivery of nails and 2 man post basher.  More posts were fitted on the canal side and recycled boards, for both sides, were cut, shaped and fitted.  Membrane laid and type 1, via the dumper, digger, barrow, rake and shovel completed the job.  It had its first customer walking down it as we left.





Work started on breaking up the collapsed wall. Considering its age it was mighty hard to break up. The mud glue, vice gripped the bricks and boots. Exhausting shift working and we almost have another walk way across the canal.



A cold few days and some serious R and R needed. A pair of mandarin ducks did seem at home enjoying life, as we left.
CCT Benches

by: Wiĺl F.

With all the dredging updates, there are other activities volunteers undertake, One is making and installing the memorial benches along the Canal Towpaths.
Admired for their pleasing appearance thanks to Eastern Depot team who cut and smooth the repurposed Greenheart wood, then assembled by Western Depot chippies with the addition of a commemorative plaque and then the heavyweight guys install to the required 26 inch depth for the posts. Sometimes this is straightforward if the ground is reasonable like this morning at Inglesham where we installed the second bench commissioned by the Hanscome Family. The first bench was installed at Saul Junction so there are now Hanscome benches at both ends of the Cotswold Canals.
Last week we were pleased to install a bench at Saul commemorating former volunteer and Saul Trip Boat crew Pat Pewsey. His wife Shirley and family shared a moment of silence to remember a dearly loved family member
In all over 70 benches have been installed creating happy memories with supporting donations to help maintain the Trust’s activities.
The Boat Team - Wednesday 

by: Myron

The Boat Team had two teams out today, with a total of seven crew. It was a bitterly cold day, and there was snow on the ground for good measure. I was surprised that the canal had not frozen at all. I was even more surprised when everyone turned up. Great commitment.

Weedie was taken down to Boakes Drive. This is to be near to where we are going to fit the mesh. While this was happening we found a couple of problems with Margaret when her checks were done. The prop shaft bolts had come loose again. We came to the conclusion they were threadbound. We brought some new bolts, flat and spring washers and for good measure some threadlock. Let’s see what happens now! The coolant water was well down yet again. Whilst carrying out the umpteenth inspection we found a drip, and managed to trace it back to a rubber hose connection. We tightened the jubilee clip and the drip stopped. For good measure we tightened all the jubilee clips we could see. Now I want everyone to keep their fingers crossed that the next time that we visit Margaret that there has been no coolant loss. Another problem was that although we removed a large amount of wire and plastic tie stuff from around the prop we could feel that there was a load more we couldn’t get to. It was now about half past eleven so rather than practice moving hoppers around, we decided to do the drydock thing at Ryeford and clear the prop there.

At this point I left the Margaret team to travel and set up in the locks, while I picked up the Weedie crew, which I did. We the arrived mob handed at WD to see if we could move the 120 kg of new mesh. After gingerly removing some of the packaging, we decided that it was best left packed up until we figured out more of the details of how we were going to move it to site and exactly when. Good old Buffer, he too it very well indeed that we were going to have to leave this in the yard for maybe some weeks yet. We cleared off before he changed his mind. We then went to see how the Margaret crew were getting on., stopping of at Stonehouse Court on the way to have a look at the lie of the land at our chosen work location, their landing stage. It has a nice big flat area that we can work on.

Anyway, we arrived at Ryeford locks to find the team there had things well in hand and were half way through the job. So we had lunch on the side of the lock…and naturally told them exactly what they were doing wrong. Good sport for a while. When I got bored with that I wandered up the cut to see what Patricia was up to. Whilst extending an invitation to us to visit for tea, they shared some very good news, but I shall leave it up to them to announce it. So we had a cup of tea and a chin wag in the winter sunshine. It was a satisfied crew that motored back to Ebley a short while later.

Thanks chaps, for turning out on a not very inviting day.