by: Ian Moody
It’s always good to have a new work site so there was much enthusiasm for getting stuck into the old weighbridge site near Eastington. The weighbridge has been disused for about a decade and has been overrun by ivy, brambles and weeds.
Once we’ve finished the tidy-up the site will become a “mini-depot” for the SDC canal team including, and this is a source of much excitement amongst our volunteers, a REAL TOILET!
It’s going to be quite a squeeze to get our containers in there whilst leaving enough room for the existing cycleway but we’ll just about manage it.
All in all a chilly, sunny successful day!