The team loaded the pickup and headed off this morning to lay another batch of bricks at Capel's Mill. This now takes the total over the magic 100.
Today, the weather was perfect for laying. The team soon had them in place. A plan is produced in advance for the position of each brick. We will be extending both directions, either side of the bench.
Thank you to everyone that has supported us with this project. You can find a link to the sponsorship form on this blog.