15 June 2019


Dudbridge Dredging and Lock tidying


by: Chris K.



Three boat's out today at Dudbridge. 

Patricia was dredging and filled the barge warp with silt, rubble and a four inches flexible pipe the length of the barge warp. 

Margaret was collecting full barges to off load at ryeford. 
Wookey hole crew of five were clearing up floating plastic and general tidying up from Ebley wharf to upper and lower Dudbridge locks.