Pat's Progress
Some times the job just gets too hot to touch. That was certainly the case today when the metal could only be leant on with gloved hands!
It was going to take more than the heat of the kitchen to stop us, with much achieved today.
We really needed to get the second coat of purple paint on. but that involved giving Pat a cold shower and wash to remove the dust that collects there over time. Most of the purple is now done. There is some to do around the doors and then the roof of the control cabin which was left due to much digging for another job going on at the front of the boat.
Elsewhere, a steady procession of worker ants brought out the decking plates from the yard and laid them for onward fitting to the boat. This was just like a puzzle. Although, it's more difficult to spot the central 'sky' pieces rather than the edge bits which have features which belie their location. One panel needed another slot cutting in due to the addition of the water filler pipe dropping down from the gunnel.
We cleaned out and re-greased the lubrication pipe to the propeller shaft. In the engine room, we had been aware of an alarm, which was possibly connected to the oil/water separator on the side of the engine. This was duly emptied of a little bit of water and the alarm disappeared - tick.
Back to paint. The second coat of white has been applied in the control cabin. Whilst the paint was still wet, we fired up the engine to check the ISO control mapping against a reference sheet provided by Andy J. It is pleasing to report that all functions operated correctly to the sheet.
We are expecting the rotator and clam shell bucket this week. This is the last major job before Pat can go and swim in our canal. The only component still in store is the solar panel. Now the roof is done, we will fit that on Wednesday.
25 June 2018
23 June 2018
The Stand In
by: The Reluctant Manager
As the last of the lunchtime tea was being swallowed and the
cups were being passed to the duty washer-up the Depot manager cleared his
throat. To the assembled throng crowded around the table he declared “I’m off
on holiday for two weeks and I need a volunteer to cover organising you lot
while I’m away.”
His gaze surveyed the down cast eyes and was occasionally
dazzled by the reflected sunlight as it caught one of the many shiny pates of
the assembled depot team.
“Well,” he said “in view of the unanimous, or did I mean
ominous, silence I’ll have to select one of you at random.” Chairs scraped
across the floor as the room emptied quicker than the scramble for the last fig
roll (a prized delicacy at WD).
With the yard clearing rapidly a hapless volunteer just back
from a job entered the mess to take his lunch. “Just the man” said the manager
“your team mates have unanimously selected you to be depot manager whilst I
spend two weeks away. You’ll have to arrange the daily work and make sure this
list”. He waved at the board full of one line task descriptions, “are finished
by the time I get back. Here’s the order book if you need anything to support
these.” Then he disappeared in a cloud of dust.
“Bu##er” said the hapless stand in.
The following Monday the stand-in manager stood before the
sea of upturned expectant faces. He knew that half of those before him were
promised to the flighty Patricia. The remainder would not be enough to complete
many of the tasks. ‘How to prioritise’ he thought. So began an auction. Who
knew anything about any of the tasks? Who could be persuaded to join those who
knew the tasks? Reaching back to his management jargon memory bank he grasped
at these: which will give me a quick win, which are the low hanging fruit?
Miraculously small groups selected tasks from the list and
work on them commenced. Some grass was cut. Stuart’s job list was started. The
office rebuild carried on and some logs were sold. The broken wooden rail under
the by pass was made safe – by removing it. Better to have no rail than one
which looks good but could collapse on contact.
The bonus ball was that this rail does not belong to CCT or SDC but to
Gloucestershire rights of way who will decide what to do next.
The sun burned off the clouds and the yard was humming.
‘This is easy’ thought the stand in. ‘I don’t know why the boss looks
harassed’.
Wednesday brought a small handful of volunteers to the depot
which made things even easier for our stand in. The ocean bridge was swung and
some repairs were effected. Stuart was cleared and cleaned. Patricia’s deck
plates were painted. Small engines were brought back to life. And the sun shone
all day. ‘Easy’, he thought ‘what can go wrong?’
The second week of the substitution arrived. The mess was
full to overflowing. Where did all these volunteers come from? ‘I’ve got to
find things for them to do’. The log team were back from their breaks quickly
disappeared to collect yet more wood for splitting. The dragon’s teeth for
Stuart needed bending and fettling, the spots where they were to be welded on
were cleaned of paint and the launching and loading bracket was made and welded
on. Grass needed cutting and grass cutters needed
banksmen. The first hour rushed past in flurry of requests for helpers, of
teams departing and manipulation of priorities. Juggling with greased balls
seemed an easier task for our stand in.
Even a simple task of collecting a small tool from a local
supplier turned into an odyssey. The correctly labelled sealed box contained a
different item. So back to the shop. “No problem, I’ll see if we have got the
right one” was the response at the counter. They did not have one. “We’ll have
one tomorrow”. Another Job slowed. During the day the list of jobs got smaller. A long day for the stand-in.
Wednesday and good news the Depot manager was back! He had
got back early and could not keep away. He is one of our electrical types and
thought that with a stand-in he could help make some serious progress with the
new office refurbishment. The duties were shared and during the afternoon, with
some prescience, the yard was filled with white smoke. Not the election of a
new Pope for the yard but a small engine burning copious amounts of oil. A
repaired engine had some obvious problems fixed but on test it was evident that
there is a deeper problem within the cylinder.
What did our stand-in learn? Planning of tasks with
volunteers who can choose when to come in is not easy. Not all the skills
needed for a task are guaranteed to turn up. WD has wide range of engineering
tasks and many of the skills needed to perform them but the number and range of
tasks we are asked to perform often exceeds our capacity to do them promptly.
This last point is illustrated by the amount of grass
cutting and towpath clearance we are asked to do and are committed to do. We
have good kit but often lack people to use it. There has been some coffee time
discussion about summer only volunteers dedicated to grass management and
possibly having dedicated grass cutting days. The discussion has included
having Tuesday and Thursday opening in the season just for grass and banks
management with dedicated teams of new volunteers for the task.
Swan and cygnets below Pike Bridge. This pen is serene but devoting all her energy to her cygnets she can no longer control her feet. She has to stand on the bottom
22 June 2018
An Easterly Intermission
Getting away from work for a moment. An almost peaceful meander along the T&S section west of the Gateway Centre. The constant noise of the PPI funded pan-European highway, that is the A419's concrete drag strip was broken only by the wide variety of bird song from the adjacent woodland.
What little water there is that puddles the bottom of the canal teamed with much wildlife. Minnows gathered in the shallows taking in the warmth. Dragonflies zipped about with a dazzling electric blue shimmer. The aquatic plants displayed their finest blooms.
The restored lower lock at Wildmoorway waits patiently for the days gates and paddle gear arrive. Let's hope its condition holds good.
The upper lock looks more forlorn, but nothing that can't be fixed. Remnants of a bottom gate break the surface of the duck weed.
There are great plans to re-water this section. It is also quite likely that the T&S mile stone will resemble that at Capel's Mill in the near future. In all, a very pleasant wander after a substantial lunch over at the western end in the sunny gardens of the Daneway pub.
Getting away from work for a moment. An almost peaceful meander along the T&S section west of the Gateway Centre. The constant noise of the PPI funded pan-European highway, that is the A419's concrete drag strip was broken only by the wide variety of bird song from the adjacent woodland.
What little water there is that puddles the bottom of the canal teamed with much wildlife. Minnows gathered in the shallows taking in the warmth. Dragonflies zipped about with a dazzling electric blue shimmer. The aquatic plants displayed their finest blooms.
The restored lower lock at Wildmoorway waits patiently for the days gates and paddle gear arrive. Let's hope its condition holds good.
The upper lock looks more forlorn, but nothing that can't be fixed. Remnants of a bottom gate break the surface of the duck weed.
There are great plans to re-water this section. It is also quite likely that the T&S mile stone will resemble that at Capel's Mill in the near future. In all, a very pleasant wander after a substantial lunch over at the western end in the sunny gardens of the Daneway pub.
SDC Thursday Gang
by: Ian Moody
We were at the Bowbridge ramp again and, as usual, the day started with a briefing.
So that’s Brewery Wall done. Tick!
by: Ian Moody
We were at the Bowbridge ramp again and, as usual, the day started with a briefing.
The main task was to install the concrete edging at the lower end of the ramp and set some fence posts along that section. On top of that a small team headed up to Griffin Mill lock to remove the stop planks and tidy up the vegetation.
The tipper team had a number of jobs to do but the main task was to remove the Heras fencing from the Brewery Wall and erect it at Brimscombe Port in readiness for the forthcoming WRG training weekend.
The poppies are looking stunning and it’s not often that we get to frolic with fencing through wildflower meadows.
So that’s Brewery Wall done. Tick!
Next up - Bowbridge Wheelbarrowfest...
21 June 2018
Western landing stage at Lodgemore takes
shape
by: David M
There are
two main types of landing stage – single-level, and those with an additional
lower level for canoes. However they all
differ in other ways depending on the nature of the location. Lodgemore West is a single-level stage, but the
bank is high and the space has no extra width for the landing stage to have a
sloped bank.
Due to the
vertical bank face, we had an extra week or two of hard work transporting,
wire-brushing, painting and fitting steel plates to sit behind the rear OBB
piles to hold back and support the towpath.
First to go
down is a weed-deterring membrane, and the wooden frames sit on steel
cross-pieces every 3rd pair of piles.
The slight offset of the frames one with another is for aesthetic
reasons, as the aesthetics don’t matter once the anti-slip green topping is in
place!
Armco is
bolted to the front face, top surface screwed down, and bollards concreted
in. The final touch from the high bank
is a set of steps, made of bricks and concrete lintels. The cygnets are bigger now, but still paying
close attention.
20 June 2018
Nearly There! Dredging week beginning 18/06/18.
by: Andrew Rendell
Dredging in present pound coming to an end although Dredger No.5 is needing a rest and refit, we are battling on.
1.5 metres deep through solid silt at Griffin mill end just before the bund.
Dry dredging team supporting fully by emptying hopper whilst we are loading, so quick.
As next 2 pictures show Les in long reach excavator clearing between bund and Griffin Mill Lock, all sorts coming out which will make it easier for Dredger and hopper to do final clear up below and in lock.
Andy in 8 ton excavator is emptying hopper as well as landscaping.
This week, 2 new volunteers to dredging turned up to see what it's like and are returning next week. Rachel and Richard
Also this week. Thanks to the main Dredger trainees and crew Alex, Frank and John S as main operator.
We've been struggling with an old war wound on a buoyancy tank where a leak on a weld below water means we are lifting the tank off Monday 25th for Chris P to weld.
As we say all in a days work, variety makes life more interesting although frustrating.
We are getting excited though as the dredging teams can say again, "we have made navigable another section of the canal".
We hope the grand occasion happens at the beginning of July.
Pat's Progress
Wow, what a great day. The morning kicked off in the usual way, but very soon we had the pleasure of our estranged Team Leader, who had popped back from his eternal holiday to make a state visit to site. There was much to see - but also so much more to be missed Bob....
The rudder is now sitting securely in its new bearing, together with the gland packing clamped in place and the actuator connected. Our prop' also sports a '3-Phase' recognition of our well bronzed Team Leader.
Up front, the ladies were in full flight painting the white hand rails, the engine room air vents, followed by the internals of the control and the welfare cabins. They are really starting to look quite smart now (the cabins, that is!). It was a busy work area with the wiring of the bilge pumps also in progress.
The main jib cylinder required fitting. This is a very heavy lump, but careful checking of the pins, surfaces and extension permitted a relatively straight forward installation followed by hydraulic hose connections.
All of the spud leg pins also received their retaining washers and split pins, as the legs were to receive their first exercise for quite some time.
As lunch time approached, we extracted two drums of hydraulic oil from the store and set about putting 50 litres into the tank, in readiness for testing. A systematic inspection of all the hydraulic joints was made to ensure all had received the attention of at least two spanners. The control lever console was manoeuvred into position and bolted down. Lunch was then taken.
A short discussion followed after we had been fed and watered, to map out how and what we were going to test and in what order. We did not want anyone getting in the way, especially as we hoped that there would be the movement of much metal.
The engine easily fired into life and an initial inspection of all the hydraulic joints revealed no problems. Then, one by one, we set about exercising each of the controls over their limits of travel to check operation and to look for any issues.
Firstly, the propeller motor was run. This was then followed by each of the spud legs and then, finally, the jib actuators. It is pleasing to report that each step ran very smoothly with no faults or issues. The only uncertainty is whether or not the jib controls are mapped for JCB, ISO or HLM! We will need to check into this next time.
Not content with having trundled past this mighty milestone, we filled the hot water system for the first time, connected the radiators, opened the valves and span up the pump. With the engine having been on for half and hour and settled at about 80 deg C, it was not long before we had heat in the rads. Again, we checked for leaks and there were none.
To celebrate our many successes and a most rewarding days effort by all, we clinked the quality Western Depot porcelain and had a toast to Patricia with a fine cup of tea!
Wow, what a great day. The morning kicked off in the usual way, but very soon we had the pleasure of our estranged Team Leader, who had popped back from his eternal holiday to make a state visit to site. There was much to see - but also so much more to be missed Bob....
The rudder is now sitting securely in its new bearing, together with the gland packing clamped in place and the actuator connected. Our prop' also sports a '3-Phase' recognition of our well bronzed Team Leader.
Up front, the ladies were in full flight painting the white hand rails, the engine room air vents, followed by the internals of the control and the welfare cabins. They are really starting to look quite smart now (the cabins, that is!). It was a busy work area with the wiring of the bilge pumps also in progress.
The main jib cylinder required fitting. This is a very heavy lump, but careful checking of the pins, surfaces and extension permitted a relatively straight forward installation followed by hydraulic hose connections.
All of the spud leg pins also received their retaining washers and split pins, as the legs were to receive their first exercise for quite some time.
As lunch time approached, we extracted two drums of hydraulic oil from the store and set about putting 50 litres into the tank, in readiness for testing. A systematic inspection of all the hydraulic joints was made to ensure all had received the attention of at least two spanners. The control lever console was manoeuvred into position and bolted down. Lunch was then taken.
A short discussion followed after we had been fed and watered, to map out how and what we were going to test and in what order. We did not want anyone getting in the way, especially as we hoped that there would be the movement of much metal.
The engine easily fired into life and an initial inspection of all the hydraulic joints revealed no problems. Then, one by one, we set about exercising each of the controls over their limits of travel to check operation and to look for any issues.
Firstly, the propeller motor was run. This was then followed by each of the spud legs and then, finally, the jib actuators. It is pleasing to report that each step ran very smoothly with no faults or issues. The only uncertainty is whether or not the jib controls are mapped for JCB, ISO or HLM! We will need to check into this next time.
(turn your telly!)
Not content with having trundled past this mighty milestone, we filled the hot water system for the first time, connected the radiators, opened the valves and span up the pump. With the engine having been on for half and hour and settled at about 80 deg C, it was not long before we had heat in the rads. Again, we checked for leaks and there were none.
See - just how hot this radiator is!