09 October 2019

Dudbridge Dredging

by: Chris K.

During the clearance of silt from the lock, the most interesting object that was removed from the lower gate entrance was the former lock gate rail. 
One end has a square bracket, the other end a threaded rod which must have passed through the lock arm. 

Dredging has now moved onto Ebley.